Melbourne Water Sewage Infrastructure Climate Change Risk Assessment
The assessment of climate change impacts of sea-level rise and storm surge/tide on selected sewerage infrastructure assets in Victoria....
The assessment of climate change impacts of sea-level rise and storm surge/tide on selected sewerage infrastructure assets in Victoria....
WestWind Energy Wind Farm and Groundwater Dependant Ecosystems...
Creswick experienced significant flooding in late 2010 and early 2011 experiencing several large events in a short period. This had a devastating impact on the community....
Phillip Island Nature Parks’ Coastal Processes Study....
Water Technology has been involved in the development of Wyndham Harbour since the early conceptual planning stages in 2003. The Harbour has evolved from the initial conceptual design through to final design and construction with the help of the Water Technology coastal and environment team....
Enhancing coastal environments to mitigate shoreline erosion...
This study was prepared for the East Gippsland CMA in June 2011 and involved a detailed hydraulic assessment of the impacts of the Snowy River Rehabilitation Project on the river and floodplain....
Bendigo Urban Flood Modelling Project....