Flood Impact Assessment

Water Technology was commissioned by Browns Consulting on behalf of Armstrong Creek Developments to document the flood behaviour of the Armstrong Creek Western Precinct for the development of Stages 1-6. Stages 1-6 were under construction as part of the multi stage development. The study detailed the hydrologic and hydraulic analysis of the study area in existing conditions with Stages 1 – 6 included. Water Technology undertook modelling using RORB and MIKE Flood packages to ensure that no adverse flood impacts are caused as a result of construction of stages 1-6.

A comparison between pre-development, current (stages 1-6) and full development was undertaken showing that the inclusion of Stages 1-6 have very little impact on flood conditions when compared to previous modelling of both existing and developed conditions.

Scope:

Flood impact assessment

Location:

ARMSTRONG CREEK

Client:

BROWNS CONSULTING

Similar Projects

Water Availability Assessment for Hydrogen Production

Assessing the availability of water resources for potential hydrogen production...

View Project

Assessing Environmental Watering Effects

Assessing the effects of environmental watering on groundwater and vegetation health...

View Project

Remote Groundwater Monitoring Review and Implementation

Reviewing the groundwater monitoring program and providing suggestions for improvements...

View Project

At work across Australia

With offices throughout the country, our team brings a
national perspective to local challenges.

Talk to an expert