Better Boating Victoria has been established to implement boating reforms that will enhance the experience of boating for all Victorians. Fundamental to this is increasing the access for as many boaters and fishers as possible. The Greater Geelong area has one of the highest rates of boat registrations per capita, though is constrained in terms of available coastal land for additional boat ramps. Therefore, Better Boating Victoria have highlighted several existing boat ramps that have the potential for increased capacity to make effective use of these assets.  To achieve this, the boat ramps require key upgrades to improve the capacity, throughput, amenity, safety and the attractiveness for users.

However, facilities in low-lying areas make them particularly prone to inundation during extreme water level conditions (such as storm tides). Sea level rise will also increase the vulnerability of the facilities to inundation under more frequent conditions and must be taken into consideration during the design phase.

Water Technology were engaged by Better Boating Victoria to develop the concept designs and investigate and assess the coastal processes to inform the design improvements of two boating facilities.

 

 

 

Scope:

Investigation and assessment of design improvements to boating facilities

Location:

Greater Geelong Area

Client:

Better Boating Victoria

The work involved:

  • Physical coastal processes assessment including wind conditions, tides, water levels and waves (considering storm tides and sea level rise)
  • Sediment transport assessment based on analysis of aerial imagery and the surrounding wave and bed conditions to determine if maintenance dredging would be needed
  • Seagrass beds assessment
  • Assessment of the potential impact of the various upgrades on the marine environment, terrestrial vegetation and cultural heritage
  • Development of stormwater management plans for the car parks
  • Concept, preliminary and detailed designs of the facilities
  • Options assessment of solutions for the repair of detached breakwater structure

Similar Projects

Water Availability Assessment for Hydrogen Production

Assessing the availability of water resources for potential hydrogen production...

View Project

Assessing Environmental Watering Effects

Assessing the effects of environmental watering on groundwater and vegetation health...

View Project

Remote Groundwater Monitoring Review and Implementation

Reviewing the groundwater monitoring program and providing suggestions for improvements...

View Project

At work across Australia

With offices throughout the country, our team brings a
national perspective to local challenges.

Talk to an expert