Jigalong is an remote community in the Pilbara. It is approximately 165 km east of Newman, in the Shire of East Pilbara. Jigalong is within the Nyiyaparli native title claim area. Jigalong Creek is immediately to the west of the community and a tributary of Jigalong Creek is immediately to the east.  The land adjoining the creeks is of high cultural significance.

Scope:

Location:

JIGALONG, WA

Client:

DEPARTMENT OF PLANNING – WA

FLOOD RISK ASSESSMENT

The Western Australia Department of Planning commissioned Water Technology to undertake a flood risk assessment of the Jigalong community. Water Technology completed the Flood Risk Assessment and Floodplain Management Strategy for the Jigalong Community, near Newman in the Pilbara.  This work was undertaken to provide information to the Department of Planning on the risk of flooding and associated hazards to property and infrastructure at Jigalong, and possible mitigation measures and development constraints.

Hydrologic and hydraulic modelling assessments.

A comprehensive hydrologic and hydraulic modelling assessment was undertaken which provided estimates of flood flows, levels, extents, depths, and hazard, and formed the basis for floodplain and design flood mapping.  The modelling revealed that Jigalong community is vulnerable to frequent, low hazard nuisance stormwater flooding, and less frequent but more severe flooding from Jigalong Creek and the tributary to the east of the community.  A floodplain management strategy was developed with the object of minimising flood risk and damage, including possible flood mitigation measures.

 

The scope of work required for this assessment involved a site survey and the development of a Digital Elevation Model (DEM), hydrological and hydraulic modelling, floodplain mapping, community consultation and the development of a floodplain development strategy including mitigation options assessment and develop-able land assessment.

The Jigalong Flood Risk Assessment was undertaken to provide the Department of Planning with flood mapping and information on flood behaviour to guide land use planning, emergency management and assessment of building and development in flood-prone areas for the Jigalong community.

Key Services Provided:

  • Catchment Hydrology – modelling and analysis
  • Hydraulic Modelling
  • Design Flood Mapping
  • Floodplain Management Strategy
  • Flood Risk Assessment
  • Stormwater Drainage Improvements and Recommendations

Similar Projects

Restoring the Banks of Waterways in the Shoalhaven Region

Water Technology assessed the extent of bank erosion and determined the feasibility of bank treatment options...

View Project

Mangrove Forest Establishment for Water Quality Improvement

Water Technology supported the development of the innovative mangrove wetland, from the vision to the conceptual design through to monitoring post construction...

View Project

Waterway Stability Monitoring of a River with Constructed Oyster Reefs

Water Technology provided support with the design and certification of oyster reef installations, in addition to monitoring and recording changes in the upstream and downstream locations of the oyster reefs...

View Project

At work across Australia & New Zealand

Our team brings diverse perspectives
and expertise to local challenges.

Talk to an expert