Flood Impact Assessment

Water Technology was commissioned by Browns Consulting on behalf of Armstrong Creek Developments to document the flood behaviour of the Armstrong Creek Western Precinct for the development of Stages 1-6. Stages 1-6 were under construction as part of the multi stage development. The study detailed the hydrologic and hydraulic analysis of the study area in existing conditions with Stages 1 – 6 included. Water Technology undertook modelling using RORB and MIKE Flood packages to ensure that no adverse flood impacts are caused as a result of construction of stages 1-6.

A comparison between pre-development, current (stages 1-6) and full development was undertaken showing that the inclusion of Stages 1-6 have very little impact on flood conditions when compared to previous modelling of both existing and developed conditions.

Scope:

Flood impact assessment

Location:

ARMSTRONG CREEK

Client:

BROWNS CONSULTING

Similar Projects

Hawkesbury-Nepean River System Coastal Management Program

Help to develop Stages 3 and 4 of the Hawkesbury-Nepean River System Coastal Management Program ...

View Project

Stormwater Management Plan for Streaky Bay

Review and update of a Stormwater Management Plan for Streaky Bay...

View Project

Hawkesbury River Cultural Restoration Strategy

Helping to develop a cultural restoration strategy for the Hawkesbury River Estuary in collaboration with First Nations Groups...

View Project

At work across Australia

With offices throughout the country, our team brings a
national perspective to local challenges.

Talk to an expert